RECENTLY COMPLETED JOBS UPDATED

Tue, 07 Feb 2012

06.02.2012 Completed following UT Measurement Surveys in the period from 18.01.2012 to 06.... Read More Details..

CMS UT Thickness Measurement approval

Tue, 07 Jun 2011

We are proud to announce that CMS passed the UT Thickness Measurement (UTTM) approval survey with... Read More Details..

New Brochure

Tue, 17 May 2011

We are proud to announce that further to the information on our website we have produced a brochu... Read More Details..

RECENTLY COMPLETED JOBS UPDATED

Tue, 07 Feb 2012

06.02.2012

Completed following UT Measurement Surveys in the period from 18.01.2012 to 06.02.2012:

-          14 year Intermediate Class Docking of Cement Tanker

-          33 year Intermediate Class Docking of General Cargo Vessel

-          20 year 4th Class Renewal Docking of RORO-Ferry

 

13.01.2012

Overhauled Coupling-switches and main breakers for Shaft Generator as well as adjusted and calibrated Pitch Control from Bridge in service. Equipment Manufacturers Lips and Siemens.

08.12.2011

Overhaul of SKL 8VD 26/20 AL-Z carried out at Luanda Anchorage with a team of 1 x Supervising Engineer and 1 x Fitter/Mechanic completed within 3 working days.  

08.12.2011

Development of MLC Manual in conjunction with clients existing SMS or Crewing Manual.

09.11.2011

Repair of Emergency Starter and Battery Charging Equipment of Emergency Generator.

17.10.2011

Complete overhaul of MAN B&W 6L 60MCC

17.10.2011

3rd Class UTTM carried out under GL at GIBDOCK Gibraltar

14.10.2011

Exchange of outer Bearing including Cover of Piller NKT 450/4. The job also included dismounting and mounting of the Generator as well as the alignment and testing of the Generator.

23.09.2011

Repair of damaged MaK 9M32. All Units including connecting rod bearing replaced or repaired as required.

13.09.2011

Complete overhaul including bearings of SKL Type VDS 29/24. The works were completed in 4 days including travel. Our team consisted of 1 Engineer and 1 Fitter.

02.09.2011

Supervision and budgeting of a 1st Class Docking for a 7400 tdw MPC

26.08.2011

HFO leak detection and repair. Leak to cargo hold detected on a Fuel Transferpipe. Temporary repair carried out. Tasks and parts for final repair specified and preventive measures advised.

22.08.2011

UT Measurements for 3rd Class renewal of a 8000 tdw MPC, under GL, completed at Algeciras Ship Yard

13.08.2011

Supervision and bugeting of a 2nd Class Docking for a 4400 tdw MPC icluding Ultrasonic Thickness Measurements under GL

01.08.2011

Complete overhaul of MaK 8M453, including bearings and T/C's

09.07.2011

Complete overhaul of 2 x Turbo Charger of MaK 6M20 T/C type ATL and overhaul of 2 Cylinder Units of DMR Sulzer 7 RTA 62U

14.02.2011

Overhaul of Caterpillar Auxiliary Engine Type 4TB04787.

18.03.2011

Supervision and bugeting of a 3rd Class Docking for a 4400 tdw MPC

24.03.2011

Assembly and Alignment of Auxiliary Engine DEUTZ TBD 616 V12.

Assembly and Alignment of generator AVK Type DSG 624M204.

16.04.2011/30.05.2011

2 x Main overhaul of MAK 6M20 Auxiliary Engine.

07.05.2011

Main overhaul and repair of Auxiliary Engine SKL Type 8VDS 29/24 Al-2.

09.05.2011

Supervision and budgeting of 1st class docking of 7000 TDW MPC.

11.05.2011

Ultrasonic thickness measurement and supervision and budgeting of 3rd class docking of a 500 TEU open top Container vessel

11.06.2011

Supervision and budgeting of 3rd class docking of 7000 TDW MPC and ultrasonic thikness measurement.

27.06.2011

Installation and alignment of new Auxiliary Engine SKL Diesel Type 8VDS 29/24 and generator.

 

RSS FeedSubscribe to RSS Feed